Du bist da : Home / Hauptprojekten / Energy from Waste Projects

Energy from Waste Projects

Detailed Steel Structure Engineering and Fabrication/Erection documentation for Combustion and Boiler, Flue Gas Treatment, Lime Slaker, Pipe racks and Pipe Supports and Bottom Ash Handling system for the following power plant projects:

· 60 MW power plant in Rookery, UK (Covanta Energy Ltd / 2018-2019)

· 60 MW power plant in Rockingham, Perth, Western Australia (Newenergy-Tribe Consortium-HZI / 2019-2020)

· 42 MW power plant in Newhurst, UK (Encyclis / 2020-2021)

· 46 MW power plant in Slough, Greater London, UK (SSE Thermal Ltd-Copenhagen Infrastructure III / 2021-2022)

· 49 MW power plant in Leeds, UK (Enfinium Skelton Grange Ltd / 2022-2023)

 

 

PDF
  • ProjektEnergy from Waste Projects
  • Zeit-Studie2018-2024
  • ArbeitgeberHitachi Zosen Inova
  • BesitzerVarious
  • PositionUnited Kingdom & Australia