Deir Ali 701 MW Power Plant - Syria

Complete combined cycle power plant on turn-key basis working on natural gas (main fuel) and distillate oil (back-up fuel), and consisting of three sections:

- Section 1: first open cycle gas turbine (OCGT) unit with capacity of 279MW at ISO conditions (complete, in operation)

- Section 2: second open cycle gas turbine (OCGT) unit with capacity of 279MW at ISO conditions (complete, in operation)

- Section 3: completion of the combined cycle plant with total net capacity 701MW at site conditions (in progress)

PDF
  • ProjetDeir Ali 701 MW Power Plant - Syria
  • Temps d'étude2013
  • EmployeurMETKA S.A.
  • PositionDamascus, Syria