MOREAS Motorway
All toll stations of the Motorway were designed at construction level:
6 Frontal Toll Posts (Spathovouni, Nestani, Asea, Petrina, Lefktro, Kalamata) and 3 ramp toll stations (Paradisia, Arfares, Thouria).
PDF- ProjetMOREAS Motorway
- Temps d'étude2009-2011
- EmployeurJ/V AKTOR SA-INTRAKAT SA (MOREAS JV)
- PositionKorinthos-Tripoli-Kalamata-Sparti
- Budget (€)10000000