High Voltage Substations
Civil Engineering Design for a series of High Voltaje Substations (150/20 KV, 110/20 KV, 400/150 KV) at different locations all over Greece (owner P.P.C) and in Albania (owner KESH). At all substations, SIEMENS was the provider of the electrical equipment and assigned the civil engineering to our company. The scope of our services comprises the full design of the control buildings, the bases and steel structures for equipment support and all the civil engineering designs of the substations (general arrangement, drainage, road design, fencing and retaining walls design, underground networks and channels, landscaping etc.).
Main projects designed: Sidirokastro Serres (1999), Nevrokopi Drama (2000), Lefkada (2001), Eretria (2002), Magiko Xanthi (2003), Sarande Albania (2003), Argirokastro Albania (2007), Heron Power Plant at Viotia (2007, 400KV), Sidenor Factory Thessaloniki (2008), Skourta Viotia (2009), Mesovouni Viotia (2009), Polimilos Kozani (2010), HELPE Petrola (2010), Kitheronas Viotia (2011).
The mean civil engineering budget for each substation is at the range of 750.000 €.
- ProjectHigh Voltage Substations
- Date1999-2011
- EmployerSIEMENS HELLAS SA
- OwnerPPC / KESH
- PlaceGreece, Albania
- Budget (€)750000