Corfu Hospital
Construction design of the New Corfu General Hospital. The surface of the building spaces is 34.365 m2. The capacity of the hospital is 299 beds, out of which 7 are ITU.
PDF- ProjectCorfu Hospital
- Date1998
- EmployerΔΟΜΗ ΟΕ
- OwnerDEPANOM S.A.
- PlaceCorfu
- Budget (€)12000000