Azzawiya Oil Harbour
The scope of work for the tender design included the access trestle (consisting of pile foundation, concrete capping beams and steel or composite steel/reinforced concrete superstructure), the dolphin (breasting and mooring) berths and the loading platforms consisting of pile foundation and concrete superstructure and finally the Walkways / Catwalks / Ladders and Handrails.
PDF- ProjektAzzawiya Oil Harbour
- Zeit-Studie2009
- ArbeitgeberARCHIRODON CONSTRUCTION (OVERSEAS) CO. S.A.
- BesitzerAZZAWIYA OIL REFINING COMPANY INC
- PositionAzzawiya, Libya
- Budget (€)150,000,000