Du bist da : Home / Projekte / Gebäude / Industrial Buildings / Logistics / Mercedes Benz Hellas-Logistics

Mercedes Benz Hellas-Logistics

Logistics building of Mercedes Benz at Aspropirgos Attiki. The covered area is 9000 m2.

The columns are concrete precast, resting on cast-in-situ foundation. The horizontal members are steel trusses resting on the concrete columns.

PDF
  • ProjektMercedes Benz Hellas-Logistics
  • Zeit-Studie2005
  • ArbeitgeberMercedes Benz Hellas SA
  • PositionAspropirgos Attiki
  • Budget (€)5000000